1 Knightsbridge Green
1 Knightsbridge Green
,Blackburn&Co

Material Index conducted a MRA of 1 Knightsbridge Green instructed by project managers Blackburn & Co’s, which included a material brokerage service. The shared aim of Material Index and Blackburn & Co was to maximise reuse of materials during the demolition process.
Material Index, with assistance from ‘Contrakt’, the strip-out contractors team on site, facilitated the collection of materials from 1 Knightsbridge Green over a period of four months. Materials that had reuse potential were catalogued within the MI platform during the MRA. There was a wide range of materials captured within the audit, so the exchange team decided to group asset types for sales outreach and targeted specific partners within our network to maximise reuse results.

£10,027.27
£8,021.82
120
10
14
These headline figures show the success of the project. We were able to add value to the project, generating increased revenue for the client and diverting materials from typical recycling/waste pathways. The benefits of MI’s hands-on approach was reflected in orchestrating 14 different collections from site.